Missabe Northern Railway

Railroad Tracks Navigation BarLink to MINN-RAIL Schedule PageLink to MINN-RAIL Layouts PageLink to MINN-RAIL Hotel PageLink to MINN-RAIL Restaurants PageLink to MINN-RAIL Hobby Shops PageLink to MINN-RAIL Links PageLink to MINN-RAIL Registration PageLink to MINN-RAIL FAQ PageLink to MINN-RAIL Contacts PageLink to MINN-RAIL Home PageLink to MINN-RAIL Information Page

The HO scale Missabe Northern Railway is essentially two railroads joined at the hip in Duluth, MN, their eastern-most terminus.  The main deck (Mainline Division) runs railroad-west from Duluth to the Twin Cities Terminals of Minneapolis and St. Paul.  The other line (Iron Range Division) climbs Proctor Hill west out of Duluth to an upper deck that represents running from Proctor railroad-west to the Mesabi Iron Range on mixed DM&IR and GN facilities. The Iron Range Division upper deck is still under construction.

Power is 95% steam under back-emf control, some with sound. 2300’ of hand laid code 70 track on spline roadbed with about 320 scratch-built-in-place turnouts are complete as of 2/07, representing about 60% of planned trackage.

All passenger and freight trains do at least some switching. Most interchange railroads are working railroads with their own switching to perform.

Superintendent Jeff Otto
Division or Location: GN Mesabi Div. and DM&IR Missabe Div.
Interchange Railroads: CB&Q, NP, SOO, Minnesota Transfer; Minneapolis, Northfield & Southern; Duluth, Winnipeg and Pacific; Mesabe Southern
Size of Railroad: 64x90 ft "L" shape - 3700 sq. ft.
Scale: HO
Era: early 1940s
Control System: Lenz DCC with CVP Wireless throttles
Scale Clock Speed: 4:1
Length of Session: Two 3 hour sessions with lunch break for Minn-Rail
Number of Crew: 25
Train Control: TT&TO and Yard Limits
Are Radios Required: No
Listed Jobs: Dispatcher, 2 true yardmasters each managing 3-4 switch engine jobs, 22 throttle jobs with heavy emphasis on switching of all types.
Accessibility: Stairs, access to walk-out door optional
Distance from hotel: 38 miles
Estimated travel time from hotel: 50 minutes
Web Site: {None...yet}

Layout Photos (click to enlarge):

 

Missabe Northern Photo 7

 

Return to Layouts Page

Information

Cute Railroad Page Divider

Note: The Click on the following link and leave the MINN-RAIL site means that the link following will take you off the MINN-RAIL website. We have no control over the content of these sites, but believe they will be of interest.   
Send email to the webmaster with questions or comments about this web site.

Site originally designed by PJWebWorx.
Copyright © 2002, 2003, 2004, 2007 by MINN-RAIL.