The
Cumberland Northern Railway main line runs from Hagerstown, Maryland to
Knoxville, Tennessee. It also has a line that runs from Norfolk, Virginia
to Harriman, Tennessee. Coal is the mainstay of the railroad, but a considerable
amount of freight traffic is also moved. The main crossing point of all
the lines is Salem, Virginia.
The line modeled represents a secondary, heavy duty main line that runs
into the heart of the Appalachian coal region. It also serves a few towns
that have agricultural, light manufacturing and warehousing industries.
On-line connections are made with the Norfolk & Western, Clinchfield,
and Louisville & Nashville railroads.
The layout is walkaround style, built in a fourteen by thirty-four foot
area. It is in the transition era with both steam and diesel power used
on trains. The dispatcher controlled main line moves three mine runs,
three locals, two coal trains each way, three freights each way and one
transfer job. Helpers are required on most trains up short, steep grades.
Three yard jobs complete the lineup. A standard (3x5) carcard and waybill
system is used, with Digitrax UT-1 and UT-4 throttles that have a toggle switch
for reversing and a large knob for speed control.
NOTE: Operators scheduled for Saturday on the Cumberland Northern will
stay for the day and operate both sessions. Operating positions can change
between sessions. Different trains are scheduled so the session is not
duplicated. We will carpool to lunch as a group.

| Superintendent |
Dave Vos |
| Division or Location: |
Appalachian coal region; Tug Fork
Subdivision of the Iaeger Division |
| Interchange Railroads: |
Norfolk & Western, Louisville
& Nashville, Clinchfield |
| Size of Railroad: |
476 square feet |
| Scale: |
HO |
| Era: |
1957 |
| Control System: |
Digitrax |
| Scale Clock Speed: |
6:1 |
| Length of Session: |
4 hours |
| Number of Crew: |
1 to 8 |
| Train Control: |
DTC / verbal |
| Are Radios Required: |
yes |
| Listed Jobs: |
Dispatcher, 3 mine runs, 3 locals,
4 coal runs, 6 freights, transfer job, helpers, 3 yard jobs |
| Accessibility: |
Basement stairs, duckunder on two
mine runs |
| Distance from hotel: |
22 miles |
| Estimated travel time from hotel: |
35 minutes |
| Web Site: |
{None...yet} |